Project Integrity at a Glance
Every site report submitted by Afrisovera engineers is AI-assessed in real time. Investors and stakeholders can track construction quality, material compliance, and progress here — always live.
—
Total Reports
—
Active Engineers
—
Global Avg Score
—
Active Projects
Live Project Status
Block A7 — Residential
92%
42% complete · 8 reports submitted · Last activity: today
✓ Foundation
✓ Blinding
🔄 Columns
Block D2 — Underground Drainage
68%
18% complete · 3 reports · 2 integrity flags pending review
✓ Excavation
⚠ Pipe laying
Healthcare Mega-Complex — Wing A
88%
25% complete · 12 reports · All integrity checks passed
✓ Foundation
✓ Columns
🔄 Decking Slab
Recent Activity Feed
Block A7 · Column casting report PASSED
Engineer AFR-ENG-0042 · Mix ratio 1:2:4 · Vibrated · 5 photos · Score 94%
5 min ago
Block D2 · Pipe laying report UNDER REVIEW
Engineer AFR-ENG-0051 · Mix ratio not stated · Integrity team notified · Score 65%
1 hr ago
Healthcare Wing A · Liveness check verified
Engineer AFR-ENG-0033 · All 4 liveness steps completed on-site
2 hrs ago
Block D2 · Material integrity FLAG — Steel diameter
AI photo analysis detected steel diameter below Y12 spec. Integrity officer dispatched.
Yesterday
Block A7 · Foundation blinding PASSED
Engineer AFR-ENG-0042 · Correct depth confirmed · Score 97%
2 days ago